Toronto City Hall

Design & Installation of a Retrofit Glazing System

  • The scope includes the design and installation of a retrofit framing system and 780 new insulated glazing units at Toronto City Hall.
  • Wind tunnel testing was used to refine the structural design criteria.
  • Eight full-scale mockups were installed on Toronto City Hall.
  • All removals are to be completed while the building remains fully occupied and functional.